loading

Jianlong Plastic-32 Years Specializing in Customized Processing of Plastic Pipes and Fittings.

If quality problems occur with purchased HDPE double-wall corrugated pipes or PVC-U drainage pipes, how are they handled?

2025-12-16
For HDPE double-wall corrugated pipes used in municipal drainage projects or PVC-U drainage pipes used in construction, we implement a full lifecycle quality commitment. Once a defect is confirmed to originate from our production process (e.g., uneven wall thickness, incomplete fusion line), we activate an emergency protocol. This involves quarantining and tracing the problematic batch of PE pipes.

Simultaneously, based on your project schedule, we prioritize replacement production or allocate stock from nearby warehouses (for standard products like HDPE water pipes and PE-RT heating pipes). For already installed PVC fittings, we provide on-site technical repair guidance. We will compensate for direct losses caused by confirmed plastic pipe quality issues according to the purchase contract and third-party assessment. A root cause analysis report will be submitted to you to ensure similar issues do not recur in other product lines like PP-R pipes or MPP cable conduits.
prev
How to obtain samples of HDPE pipes, PVC-U fittings, or PP-R pipes?
What are the lead times for HDPE water pipes, PVC-U fittings, and PE-RT underfloor heating pipes?
next
Related questions
no data
GET IN TOUCH WITH Us

The company has a comprehensive range of products and a complete range of pipes and fittings, and can provide customers with one-stop, all-round pipeline customization and production and sales supply.

Contact Us

Contact: Manager Wang

Tel: +86 17860052961

E-mail: jianlongplastic@gmail.com

Address: Jinger Road, Jiaoshan Town, Ju County, Rizhao City, Shandong Province

Copyright ©  Shandong Jianlong Plastic Co., Ltd. - www.jianlongplasticpipe.com | Sitemap | Privacy Policy
Customer service
detect