What are the lead times for HDPE water pipes, PVC-U fittings, and PE-RT underfloor heating pipes?

2025-12-16
As a one-stop plastic pipe supplier, lead times vary by product type and order size. Standard specifications of HDPE water pipes (DN20-DN500) are typically available from regular stock within 7-10 days, while batch production requires 25-35 days. The mold-based production cycle for PVC-U drainage pipes and fittings is 30-45 days.

PE-RT underfloor heating pipes (with oxygen barrier) require dedicated production lines, with a lead time of approximately 40-50 days. For initial orders of MPP power pipes or custom-sized HDPE double-wall corrugated pipes, involving raw material procurement and process setup, we recommend allowing 60 days. During peak seasons (e.g., concentrated municipal project procurement), lead times may extend by 10-15%.
prev
If quality problems occur with purchased HDPE double-wall corrugated pipes or PVC-U drainage pipes, how are they handled?
What packaging standards are used for exporting HDPE pipes and PVC fittings? Can eco-friendly packaging be customized?
next
Related questions
no data
GET IN TOUCH WITH Us

The company has a comprehensive range of products and a complete range of pipes and fittings, and can provide customers with one-stop, all-round pipeline customization and production and sales supply.

Contact Us

Contact: Manager Wang

Tel: +86 17860052961

E-mail: jianlongplastic@gmail.com

Address: Jinger Road, Jiaoshan Town, Ju County, Rizhao City, Shandong Province

Copyright ©  Shandong Jianlong Plastic Co., Ltd. - www.jianlongplasticpipe.com | Sitemap | Privacy Policy
Customer service
detect