Revolution in pipeline construction efficiency: How does hot-melt butt welding technology improve the installation speed of PE pipes?

In municipal pipe networks, water supply and drainage projects, PE pipes are widely used due to their corrosion resistance and flexibility, and installation efficiency has always been the focus of construction parties. Traditional connection methods such as flange connection and adhesive connection are not only cumbersome, but also greatly affected by ambient temperature and operator proficiency, and often become a "stumbling block" that slows down construction schedules. Today, the popularization of hot-melt butt welding technology is setting off an efficiency revolution in pipeline construction.
图片33
图片333

The core logic of hot-melt butt welding technology is "high-temperature melting and pressurized bonding". The PE pipe port is heated to a molten state (usually at 180-200℃) through special equipment. After removing the heating plate, the two ends are quickly aligned and pressurized. After the interface is cooled and solidified, the pipe and the interface form an integral structure. This method eliminates the need for pre-processing links such as flange procurement and glue mixing. The single interface connection time is shortened from more than 30 minutes in traditional processes to 10-15 minutes, and the efficiency is increased by more than 50%.


More importantly, hot-melt butt welding technology is highly adaptable to construction scenarios. In outdoor construction, even in low temperature or humid weather, as long as the interface is cleaned well, it can still operate stably. Traditional adhesive connections are prone to insufficient bonding when the temperature is below 5℃, while hot-melt butt welding can ensure consistent interface strength by regulating the heating temperature and pressure. Data from a municipal water supply project shows that after adopting hot-melt butt welding technology, the single-day PE pipe laying length increased from 80 meters to 150 meters, and the construction period was directly shortened by one third.


In addition, the "ready-to-use" feature of hot-melt butt joint reduces the subsequent rework costs. If leakage occurs in traditional connections, the interface needs to be removed and re-operated, while the interface qualification rate of hot-melt butt joint can reach more than 98%, and once cured, it can withstand the working pressure of the pipe, without waiting for the glue to cure and other additional time. For modern projects that pursue "fast pace and high quality", this "one-time molding" advantage is undoubtedly an important guarantee for improving efficiency.


From process simplification to scene adaptation, from reducing rework to stabilizing quality, hot-melt butt joint technology is redefining the industry standard for PE pipe installation with real efficiency improvement. At a time when urban construction is accelerating, this technology is not only an upgrade of construction tools, but also a "weapon" for engineering parties to reduce costs and increase efficiency, injecting new efficient and reliable momentum into the field of pipeline construction.

prev
Faced with a wide variety of PE water pipes, how can we choose high-quality products? ​
Pipeline design experts share: Practical application experience of PE pipes in gas transportation projects
next
recommended for you
no data
Get in touch with us

The company has a comprehensive range of products and a complete range of pipes and fittings, and can provide customers with one-stop, all-round pipeline customization and production and sales supply.

Contact Us

Contact: Manager Wang

Tel: +86 17860052961

E-mail: jianlongplastic@gmail.com

Address: Jinger Road, Jiaoshan Town, Ju County, Rizhao City, Shandong Province

Copyright © 2025 Shandong Jianlong Plastic Co., Ltd. - www.jianlongplasticpipe.com | Sitemap | Privacy Policy
Customer service
detect