What are the construction specifications for laying PE-RT underfloor heating pipes? How to prevent oxygen permeation and local overheating?

2025-12-16
PE-RT underfloor heating pipe installation must follow strict specifications:
1. Design Phase: Use professional software for heat load calculation. Pipe spacing should be 150-300mm, single loop length ≤120m, and resistance imbalance <15%.
2. Material Selection: It is essential to choose five-layer co-extruded PE-RT pipes with an oxygen barrier layer to prevent oxygen diffusion from corroding metal components in the system.
3. Laying Process: The pipe bending radius must be ≥6 times the pipe diameter, secured with plastic clips. Kinks are strictly prohibited.
4. Pressure Testing: Conduct separate pressure holding tests at 0.8MPa (pressure drop ≤0.05MPa in 24 hours) after laying and before concrete pouring. 5. System Protection: Set temperature limits (supply water temperature ≤60°C). We provide complete technical briefings and on-site supervision services.
prev
When designing an agricultural irrigation system, how to choose suitable PE irrigation pipes and drip tape products?
Can Jianlong provide custom processing services for non-standard plastic pipe fittings?
next
Related questions
no data
GET IN TOUCH WITH Us

The company has a comprehensive range of products and a complete range of pipes and fittings, and can provide customers with one-stop, all-round pipeline customization and production and sales supply.

Contact Us

Contact: Manager Wang

Tel: +86 17860052961

E-mail: jianlongplastic@gmail.com

Address: Jinger Road, Jiaoshan Town, Ju County, Rizhao City, Shandong Province

Copyright ©  Shandong Jianlong Plastic Co., Ltd. - www.jianlongplasticpipe.com | Sitemap | Privacy Policy
Customer service
detect