loading

Jianlong Plastic-32 Years Specializing in Customized Processing of Plastic Pipes and Fittings.

Coal Mine Project —— The Safe Breakthrough of Underground Polyethylene Pipes

Project Background:
In coal mining companies, the aging and damage of pipes in underground drainage and ventilation systems are significant causes of safety accidents. To improve coal mine safety production levels, a large African coal mining enterprise decided to comprehensively renovate its underground drainage and ventilation pipelines. Seeking plastic pipes with higher safety performance, the company partnered with us to launch the project.

Solutions:
Jianlong Plastic provided underground coal mine polyethylene pipes (compliant with MT558.1 standards) for the project. These pipes feature antistatic and flame-retardant properties, meeting the safety requirements for underground coal mine environments. Additionally, their smooth inner walls and low roughness coefficient effectively reduce water flow resistance and improve drainage efficiency. Considering the complex geological conditions and high-pressure environment in coal mines, Jianlong Plastic enhanced the pipes' compressive strength through a combination of high-strength polyethylene resin and special structural designs. This enables the pipes to withstand underground high pressure and rock extrusion.

jianlong plastic pipe.jpg
pipes manufacture.jpg


Project Implementation Process:

Before project commencement, Jianlong Plastic’s technical team conducted detailed surveys and analyses of the underground coal mine environment. Based on the geological conditions and usage requirements of different areas, they developed tailored pipeline laying plans.


During installation, faced with narrow underground spaces and harsh construction conditions, Jianlong’s technical personnel closely collaborated with the coal mine’s construction team. They employed advanced installation tools and techniques to ensure pipeline installation quality. Meanwhile, to guarantee construction safety, the team strictly adhered to underground coal mine safety procedures and implemented a series of safety precautions.


After installation, comprehensive inspections and debugging were carried out, including pressure tests, antistatic performance tests, and flame-retardant performance tests, to ensure the pipes met underground coal mine safety standards.


Project Outcomes:

Following the renovation, the coal mine’s underground drainage and ventilation systems operated stably, with a significant reduction in safety accident rates. The service life of the pipes was also notably extended, minimizing production downtime caused by pipeline maintenance and replacement, and improving the coal mine’s production efficiency.


The coal mine enterprise’s leader highly evaluated Jianlong Plastic’s products and services: "Jianlong’s underground polyethylene pipes have provided a strong guarantee for our coal mine’s safe production. They are reliable products we can trust."


prev
Revolutionizing Agriculture: Eastern European Irrigation Project Introduces Smart Drip Irrigation Systems with Innovative Pipe Materials
Middle East New Energy Park —— Ground Source Heat Pump Pipes Boost Green Buildings
next
recommended for you
no data
Get in touch with us

The company has a comprehensive range of products and a complete range of pipes and fittings, and can provide customers with one-stop, all-round pipeline customization and production and sales supply.

Contact Us

Contact: Manager Wang

Tel: +86 17860052961

E-mail: jianlongplastic@gmail.com

Address: Jinger Road, Jiaoshan Town, Ju County, Rizhao City, Shandong Province

Copyright © 2025 Shandong Jianlong Plastic Co., Ltd. - www.jianlongplasticpipe.com | Sitemap | Privacy Policy
Customer service
detect